    Project Details

  • Market:
  • Client: Department of Veterans Affairs
  • Location: Montevallo, Alabama

Alabama National Cemetery

Scope of Work:

Brad Cole Construction was the turnkey site contractor for the Phase 1B construction of the Alabama National Cemetery, Montevallo, Alabama for the Department of Veterans Affairs.  Project included the construction of: main entrance, roadways throughout cemetery, permanent administration and maintenance buildings, public information center, two shelters for services, 8100 casket sites, 2100 in-ground/above-ground cremation sites, and 2700 columbarium niches.

Details:

  • 20 acres of clearing and grubbing
  • 9 acres of selective thinning and pruning
  • 167,700 cubic yards of site excavation
  • Installed 6,000 linear feet of storm drain system 18” – 36” reinforced concrete, ductile iron, and PVC pipe, precast concrete inlets, manholes and 45 headwalls
  • Installed precast concrete box culvert sized 10×5 and 8×4 and 318 linear feet
  • Installed 2,000 linear feet of domestic water system
  • Constructed irrigation pond with 78,000 square feet of HDPE liner and Shoal Creek intake structure
  • Installed 2 sanitary sewer duplex grinder 7.5 horse power pump stations
  • Constructed 10,200 linear feet of roadways and parking with of 13,100 linear feet of curb and gutter and the placement of 20,000 tons of base stone