Scope of Work:
At peak times BCC had more than 50 machines in operation on site. The CCR Project included the placement of 1,235,000 cubic yards of permeability clay. The Gypsum Storage Project included the installation of 27 acres of 60 mil HDPE liner and geogrid.
Details:
© 2019 Brad Cole Construction, 2250 Lovvorn Road, Carrollton, Georgia 30117